Conservation Commission Meeting Agenda 10/13/09
TOWN OF MONTEREY CONSERVATION COMMISSION AGENDA

Meeting Date: Tuesday, October 13, 2009
Meeting Time: 6:00pm (Hearings will be heard in the order they are received at the town hall)
Meeting Place: Town Hall Meeting Room

Continued Hearings & Meetings


1.
Kalodner – Tyringham Rd – Enforcement Order – 5 trees cut within 0-50 feet of a BVW; needs to file to remediate violated RDA and to perform any additional cutting to open a requested view to the wetland (continued from the August meeting) applicant requested this be continued until the October 13th meeting
2.
Wasserman – 40 Elephant Rock Rd – amend OOC DEP#230-021 (D. Dempsey – continued from the September meeting)
3.
Miller – 24 Carrington-Battelle Rd – Enforcement Order sent in August – owners have retained Berkshire Wetland Services to perform a wetland delineation as required by the Commission.

New Hearings & Meetings


1.
Driscoll – 402 Main Rd – SMA RDA – remove trees (C. Blair)
2.
Klingenstein – 149 Hupi Rd – NOI #230-0254 - to address drainage issues on the property that is causing erosion of an existing path, and will reconstruct a terrace in the area of existing impervious asphalt; vista pruning and the construction of a boardwalk will also take place. (D. Dempsey)
3.
Levy – 16 Hebert’s Cove – Request for Certificate of Compliance (C. Blair)
4.
Hartman – 37 Steven’s Lake – RDA - to perform boring and trenching work required to connect electric, water and sewer lines between the barn and residence.  The work will take place mainly within the 50’ no disturbance zones of an intermittent stream and Steven’s Pond, with minor excavation work in the 100’ buffer zone of Steven’s Pond and the intermittent stream. (R. Andrus)
5.
Canning – RDA – 102 Stevens Lake Rd - to place a foundation, driveway and septic system in the buffer zone of Stevens Lake. (T. Lovett)

Enforcement & Emergency Orders:


1.
Dolber – 142 Main Rd., Enforcement Order (sent 8/12/09)
2.
Smith – Send enforcement order after reviewing pictures taken from the lake

Misc:


1.
Review Mail
2.
Approve minutes from 9.14.09 meeting
3.
Conservation Commission Chairperson Rotation
4.
Levkoff/26 Eaton Rd; Phase II discussion
5.
Prepare procedure for filing to repair/replace a dock for website.  New docks require Chapter 91 approved application and RDA filing.  Existing docks
6.
Outline procedures for dealing with downstream impacts.

Special Notes:
Deadline for paperwork submittal for the Monday, November 9th meeting is: Monday, October 26th by 3pm.

Project Review Schedule:
Dave: Oct Chris: Nov Tim: Dec Rick: Jan